Top.Mail.Ru

Snagging report

Report in PDF format
After the inspection closes you will get a report in PDF format, where you can find all violations of the existing building requirements detected by our professionals. The report will be sent to your email or messenger.

Based on this document, the developer is obliged to rectify all identified violations.

After a technical inspection of the property, PKB specialists prepare a Snagging Report, a detailed document that reflects the actual condition of the real estate. The report lists all identified defects, non-compliances with building standards, and deviations from expected workmanship quality.

The Snagging Report is delivered in electronic format (PDF) and sent to you by email. You can use the document to submit a formal claim to the developer or contractor and request remediation of the identified issues.

We prepare the report so that it is clear, well-structured, evidence-based, and practically useful for protecting your interests.

FAQ
Made on
Tilda