Inspection report
Report in PDF format
After the inspection closes you will get a report in PDF format, where you can find all violations of the existing building requirements detected by our professionals. The report will be sent to your email or messenger. Based on this document, the developer is obliged to rectify all identified violations.
Sample inspection report
Frequently asked questions
Inspection of window and door structures; checking engineering systems (ventilation, water, sewage, electricity); examination of walls and floors; inspection of finish quality; preparation of an inspection report. Additional services such as floor plan or legal services can be ordered.
You will receive a properly prepared inspection report (defect list) with construction defects identified during the handover. The report is sent to the client electronically in PDF format.
Everything depends on the size of the apartment. On average: up to 40 m² — 1 hour; up to 70 m² — 1.5 hours; up to 100 m² — up to 2 hours. Over 100 m² — at least 2 hours.
It is best to submit a request one to two days in advance. If you need an urgent inspection, we can often come the same day.